What is a standup meeting?
A standup is a short daily team meeting where everyone shares progress, plans and blockers. Where it comes from, a simple format, and how to keep it short and useful.
On this page
A standup is a short daily meeting, often 15 minutes or less, where a team shares what they've done, what they're doing next and what's blocking them. The name comes from the habit of standing up to keep it short. It's part of agile ways of working, where Scrum calls it the daily scrum. Many teams now run standups over video, or in writing instead of a meeting.
The classic three questions
- What did I finish since the last standup?
- What am I working on today?
- Is anything blocking me?
The third is the most important: standup exists so blockers surface quickly and someone can help.
A good standup format
| Part | Time |
|---|---|
| Blockers first: who's stuck, who can help | 3 to 5 minutes |
| Walk the board: in review, then in progress | 5 to 8 minutes |
| Anything the whole team needs to know | 1 to 2 minutes |
| Follow-ups taken offline | After the meeting |
Walking the team's board, rather than going person by person, keeps the focus on work flowing rather than on status reports.
Keeping it short
- Same time every day, starting on time.
- Detailed discussions after the meeting, with only the people who need to be there.
- Speak from your issues, not from memory. If your tracker is up to date, your update writes itself. See running standup from your Linear issues.
- Skip the backlog. Standup is about today.
Async standups
Many teams, especially across time zones, post standup updates in writing instead of meeting, for example in a chat channel each morning. The same three questions work. Written standups save meeting time and leave a record, at the cost of less real-time discussion. See what is asynchronous work?
An example update
"Yesterday I finished the export endpoint (ENG-123). Today I'm on the export button (ENG-130), should be in review this afternoon. Blocked on the empty-state design for ENG-128; Sam, could we look at it after standup?"
Short, specific, with issue IDs so others can find details, and a clear ask.
Who should attend
Standup is for the people doing the work together: usually the developers, designers and anyone else on the team's board, plus the person who facilitates. Stakeholders who want status updates are often better served by a written summary or a sprint review, which keeps standup short and focused on coordination. For the sprint rhythm that standups sit inside, see what is a sprint (or cycle)?
Common problems
- It runs long: discussions that involve two people should happen after.
- It's a status report for a manager: walk the board and focus on blockers instead.
- People aren't prepared: a one-minute look at your issues beforehand fixes it.
- It interrupts focus: schedule it at the start of the day, or before lunch, rather than mid-morning.
Standup and your calendar
Standup is often the first meeting of the day. A countdown helps you prepare and join on time. OneNotch shows one on the MacBook's closed notch from 15 minutes before each meeting, with a Join button if it's a video call, and its Linear screen shows your in-progress issues first, which is exactly what you'll talk about. See a daily routine with Linear.
FAQs
Why is it called a standup?
Standing was meant to keep the meeting short. Many teams sit, or meet online, but the name stuck.
How long should a standup be?
Around 15 minutes at most for most teams.
Is a standup the same as a daily scrum?
The daily scrum is Scrum's version of a daily standup.
Do we need a standup if we use an issue tracker?
Many teams keep a short standup for blockers and coordination, or move to written updates.