What is a sprint (or cycle)?
A sprint, or cycle, is a fixed, short period in which a team commits to a set of work, then reviews and plans the next. How sprints work, typical lengths, and Linear's cycles.
On this page
A sprint is a fixed, short period, commonly one or two weeks, during which a team works on an agreed set of tasks, then reviews what was done and plans the next. The term comes from Scrum, an agile framework, where sprints last a month or less. Linear calls its version a cycle, which repeats automatically on a schedule. Both give a team a regular rhythm of planning, doing and reviewing.
How a sprint works
- Planning: the team chooses work for the sprint from the backlog, based on priority and capacity.
- Doing: the team works on those issues, often with a daily standup to surface blockers.
- Review: at the end, the team looks at what was completed.
- Retrospective: the team discusses what went well and what to change.
- Next sprint: planning starts again.
Scrum defines these events formally; many teams use a lighter version.
Sprints vs cycles
| Scrum sprint | Linear cycle | |
|---|---|---|
| Length | A month or less, often 1 to 2 weeks | Set per team, often 1 to 2 weeks |
| Starts | When the team plans it | Automatically, on a schedule |
| Unfinished work | Returned to the backlog or re-planned | Can roll over automatically, depending on settings |
| Ceremonies | Planning, daily scrum, review, retrospective | Up to the team |
The ideas are the same: a time box that focuses the team on a limited set of work. See Linear cycles, explained.
Why teams work in sprints
- Focus: a limited set of work for a limited time.
- Predictability: over several sprints, teams learn how much they can finish.
- Regular feedback: stakeholders see progress every sprint.
- Built-in reflection: retrospectives make improvement routine.
Sprints and estimates
Many teams estimate issues, in points or rough sizes, to judge how much fits in a sprint. Over several sprints, the total finished per sprint gives a sense of the team's capacity. Estimates are rough by nature; their value is in planning conversations ("this looks bigger than it sounds, should we split it?") rather than precision. Teams that don't estimate often plan by counting issues and splitting anything that looks large. For how a tracker holds all this, see what is an issue tracker?
Choosing a length
Shorter sprints give faster feedback but more planning overhead; longer ones allow bigger pieces of work but slower adjustment. Most teams try a length for a few sprints and adjust.
An example
A team runs two-week cycles starting on Mondays. On the first Monday, they plan twelve issues based on what they finished in recent cycles. Each morning's standup focuses on blockers. Midway, an urgent bug comes in; they add it and move a lower-priority issue out. At the end, ten of twelve are done; the two unfinished ones roll into the next cycle, and the team notes that one was larger than estimated. The next plan takes that into account.
Common pitfalls
- Overfilling: planning more than the team can finish, every time.
- Constant scope changes: if new work arrives mid-sprint all the time, the time box isn't working.
- Rollover without reflection: issues that roll over repeatedly need to be split, unblocked or dropped.
- Ceremony for its own sake: keep only the meetings that help.
Sprints in your day
For an individual, a sprint is simply what you've committed to this week. OneNotch's Linear screen shows your assigned issues in the Mac's notch, grouped by status with in-progress work first, and from an issue's view you can move it into a cycle without opening Linear. Creating and configuring cycles happens in Linear. See what is a standup meeting? for the daily side.
FAQs
How long is a sprint?
In Scrum, a month or less. Many teams use one or two weeks.
Are sprints and cycles the same?
They serve the same purpose. Linear's cycles repeat automatically on a schedule.
What happens to unfinished work at the end of a sprint?
It goes back to the backlog or into the next sprint, depending on the team's process.
Do all teams need sprints?
No. Teams handling mostly interrupt-driven work often use a prioritised queue with work-in-progress limits instead.