Linear sub-issues: when to use them
Sub-issues break a Linear issue into smaller pieces with their own owners and statuses. When to use them instead of a checklist or a project, and how to keep them manageable.
On this page
Sub-issues in Linear are issues that belong to a parent issue. Use them when a piece of work splits into parts that need their own owner, status or timing, such as backend and frontend changes for one feature. If the parts are just steps one person will do in an afternoon, a checklist in the description is lighter. If the work spans weeks and many people, a project fits better.
How sub-issues work
A sub-issue is a full Linear issue with a parent. It has its own assignee, status, priority, estimate and labels, and can even sit in a different team or cycle from its parent. The parent shows its sub-issues and how many are done, so you can see progress at a glance.
You can create sub-issues from the parent issue in Linear, or set an existing issue's parent. Linear's documentation at linear.app/docs covers the details.
An example
Take "Users can export reports as CSV". It involves an API change by a backend engineer, a button by a frontend engineer, and a help article by someone in support. Three owners, three timelines: that's three sub-issues under one parent. Each moves through its own statuses, and the parent shows "2 of 3 done" as they finish.
Compare "Rename the settings tab", which one person does in an hour. Sub-issues would only add overhead; a line or two in the description is enough.
When to use sub-issues
| Situation | Best fit |
|---|---|
| Steps one person will finish in a day | A checklist in the description |
| Parts with different owners or teams | Sub-issues |
| Parts that ship at different times | Sub-issues |
| A deliverable spanning weeks, many issues and people | A project |
| A loose collection of related issues | A label or a project |
The test: does each part need to be tracked on its own? If yes, make it a sub-issue. If not, keep it inside the parent.
Good habits
- Keep the parent meaningful. The parent describes the outcome ("Users can export reports"); sub-issues describe pieces ("Export API endpoint", "Export button in settings").
- Don't nest deeply. A sub-issue of a sub-issue is occasionally useful; more levels usually mean the work should be a project.
- Give each sub-issue an owner. Unowned sub-issues tend to sit forever.
- Close the parent when the outcome is done, not necessarily when every sub-issue is. Cancel sub-issues that turned out unnecessary.
- Estimate the pieces, not just the parent, if your team uses estimates.
Sub-issues and work-in-progress
Breaking work down can quietly increase how much is in progress at once: five sub-issues all "In Progress" is five things in flight. Work through them one or two at a time, and keep statuses honest. See keeping work-in-progress low in Linear.
Seeing sub-issues from the notch
In OneNotch, open an issue from My issues (press Return) and its view shows:
- The sub-issues, with a count of how many are done out of the total.
- A link to the parent, if the issue is itself a sub-issue.
- Linked pull requests, comments and the description.
Sub-issues assigned to you also appear in your My issues list in their own right (see seeing My issues without opening Linear), grouped by status, so you can change their status with S as you finish each piece. Creating sub-issues is done in Linear; OneNotch's quick create makes standalone issues. See creating Linear issues fast.
FAQs
Can sub-issues be in a different team from the parent?
Yes. A sub-issue is a full issue and can belong to another team.
Does completing all sub-issues close the parent?
That depends on your workspace's settings. Check Linear's documentation, or close the parent yourself when the outcome is done.
Should I use sub-issues or a project?
Sub-issues for one deliverable with a few parts; a project for larger work spanning weeks and many issues.
Can I see sub-issue progress without opening Linear?
Yes. OneNotch's issue view shows the sub-issues and how many are done.