How to change an issue's status in Linear quickly

Change a Linear issue's status in seconds with the S shortcut in Linear, by dragging on a board, or from the notch without opening Linear. Plus keeping statuses honest.

On this page
  1. In Linear
  2. From the notch
  3. Let automation do some of it
  4. Keep statuses honest
  5. Choosing the right status
  6. A habit worth building
  7. FAQs

The quickest way to change an issue's status in Linear is the keyboard: select the issue and press S, then type the first letters of the status and press Return. On a board, drag the card between columns. Without opening Linear at all, OneNotch lets you do the same from the notch: select the issue in My issues and press S.

In Linear

With the keyboard:

  1. Select the issue in a list, or open it.
  2. Press S.
  3. Type part of the status name, such as "prog" for In Progress, or use the arrow keys.
  4. Press Return.

On a board: drag the issue's card to another column.

With the command menu: press ⌘K, type "status", and choose.

Linear's shortcuts can change; Linear's help and the shortcut overlay show the current set. See Linear keyboard shortcuts worth learning.

From the notch

OneNotch's Linear screen lets you change status without switching to Linear:

  1. Hover the notch (or press ⌃⌥N, then L on Home).
  2. Move to the issue in My issues with J and K.
  3. Press S and choose the status from your team's workflow states.

The change shows immediately and the issue moves to its new group. If Linear refuses it, OneNotch puts it back and shows why. The same picker approach works for priority (P), assignee (A), labels (L), estimate (E) and due date (D). In the issue view you can also change cycle and project.

Let automation do some of it

If your team links Linear to GitHub, Linear can move issues automatically as pull requests progress, for example to In Progress when a branch or draft pull request appears and to Done when it's merged, depending on your team's settings. That keeps statuses current without anyone remembering. See Linear and GitHub together.

Keep statuses honest

Fast status changes only help if statuses mean something:

  • Move to In Progress when you actually start, not when you plan to.
  • Keep In Progress short. If several issues sit there, either finish some or move them back. See keeping work-in-progress low.
  • Use In Review (or your team's equivalent) when waiting on others, so blockers are visible.
  • Close or cancel issues that won't happen, instead of leaving them in Todo.

Choosing the right status

Teams set up their own workflow states in Linear, but most follow a similar shape:

Kind of stateTypical namesMeans
TriageTriageNew, not yet accepted by the team
BacklogBacklogAccepted, not planned yet
UnstartedTodoPlanned, not started
StartedIn Progress, In ReviewBeing worked on or awaiting review
CompletedDoneFinished
CanceledCanceled, DuplicateWon't be done

OneNotch shows My issues in this order, started states first, so what you're actively working on is always at the top of the list.

A habit worth building

Change status at the moment it changes: when you start, when you open a pull request, when you're blocked. With a key in the notch, that's a few seconds and doesn't pull you out of your editor. At standup, your board then tells the truth. See running standup from your Linear issues.

FAQs

What's the Linear shortcut to change status?

S, with an issue selected or open.

Can I change status for several issues at once?

In Linear, select several issues (often with X) and change them together. OneNotch changes one issue at a time.

Why did my status change in OneNotch bounce back?

Linear refused it, for example because of a permission or a workflow rule. OneNotch rolls back and shows the error.

Does changing status in OneNotch notify my team?

It's a normal change in Linear, so Linear's usual notifications apply.